POWER2Deutz
- Funding body: private funding.
- Partners: Deutz Spain (coordinator) and Ariema.
- Other collaborators: AEM Power Solutions, AEG, Vinci and Gas Eco. Duration: 48 months (starting in 2024).
- Total budget: Confidential.
The Power2Deutz project is a demonstration project for the hydrogen value chain, with hydrogen produced through alkaline electrolysis using solar energy and its real-world application in a DEUTZ TCG 7.8 hydrogen engine in an industrial environment.
In this project, Ariema provides a 500 kW electrolyser prototype and supports the design of the test site and its integration with the electrolyser.